Way to go CHS Volleyball!
Deputy Secretary Dr. Vickie Bannerman to visit Clayton Schools
Clayton Schools FY22 Budget Community Forum April 27, 2021
CMS Regular Board Meeting April 21, 2021
The games tonight with Raton will be streamed on Fm 93.6 enchanted air KRTN Facebook page.
Homecoming 2021
Student Council Homecoming
Clayton Municipal Schools
Request for Quote
2021-001
Kiser/Jr. High Multipurpose Courts
Renovation
Quotes Due:
April 7, 2021
By 4:00pm
Submit Sealed Quotes to:
Clayton Municipal Schools
323 South Fifth St.
Clayton, NM 88415
For any questions contact Tim Callis @ tim.callis@claytonschools.us or 575-207-7843
PROJECT INFORMATION
A. PURPOSE
The purpose for this request for quotes is to solicit proposals to renovate surface at Kiser/Jr. High Tennis courts with concrete.
B. PROJECT DESCRIPTION
The quote must include the full process of renovating the surface at Kiser/Jr. High Multipurpose courts. Present a breakdown of labor and material cost. Failure to meet all minimum specifications will result in the disqualification of the quote. Clayton Schools will provide brackets for anchoring new basketball goals.
Addendum for Concrete at Jr. High-
Each Contractor to provide a descriptive bid on the items listed below.
Site has already been demoed and contractor has a fresh base in which to start.
1. Contractor responsible for compaction of existing site.
2. Minimum thickness of pour is 3.5 in with 8 in around parameter.
Dimensions: Length = 122ft Width = 160ft
3. Light texture broom finish.
4. Edging to be rounded and the adjacent soil to be within 1/2 to prevent tripping.
5. Materials to be 3000psi or greater concrete suitable for multi-use function to include the occasional access onto the area with light equipment and standard 3/4 ton pickup trucks.
6. Slope to be minimum 1/8 per foot to allow for drainage away from any structure.
8. Provide a cracking control measure to prevent random cracking.
9. Reinforcement in the slab (Rebar or wire).
10. Contractor to be responsible for permits, P&P bond, wage decision, certified payroll, and other documents as required for a construction project on a school facility.
11. Payment to be made upon completion and owner acceptance of work conducted.
C. PROJECT PLANNING SCHEUDLE
Sealed quotes Due: April 7, 2021by 4:00pm
Contract Approval April 21, 2021 at 6:00 p.m. (MST) during the Clayton Municipal School Board meeting
Completion Window April 22, 2021 – June 25, 2021
Volleyball vs Raton
Power should be restored by 8:15. We will be starting school at normal time. If this changes, we will notify you as soon as possible.
VB vs Texico
Attendance
CHS 3rd Nine Weeks Honor Roll
CMS Regular Board Meeting March 17, 2021
https://drive.google.com/file/d/1NLiDzJroyKuOgTsQqqGp_uUjtT4I2hZi/view?usp=sharing
https://meet.google.com/gmo-dpoh-wam
Here is the link for the LIVE School Board meeting starting at 6:00 pm
Due to high wind and blizzard conditions, all in person learning will be cancelled for today, Wednesday March 17, 2021 at Clayton Municipal Schools. All CMS students will receive their instruction online remotely. Please stay safe at home and out of this bad weather.
CMS Board Meeting -Open to the Public
Jackette Volleyball
Jackette Volleyball vs Cimarron Rams
Varsity Volleyball tonight in Springer at 5:00 p.m. No fans are permitted. Game will be live streamed on NFHS network. It will also be streamed on Clayton Municipal Schools Facebook Page.